|
Project Brief Information
“Small hydropower maintains its position as one of the most reliable and cost efficient renewable energy source.”
Noor Power is currently working on two hydro powers Project
|
 |
|
|
Trimmu Hydro Power Project
Trimmu Hydropower Projectis of 19.2MW is on Trimmu barrage located about 3km downstream of the confluence of Jhelum and Chenab rivers near Jhang. The barrage is located at about 292km downstream of Marala Barrage on Chenab River near Jhang. It falls in the semi-arid zone with desert on its right and Rechna Doab on the left side. The site is linked through wide networks of road to Jhang at the famous town of Atharan Hazari where there is the confluence of rivers Chenab and Jhelum. At this point the Jhelum River flows into the Chenab River. The maximum design capacity of this barrage is 18265m3 /sec (645000 cfs).
Features of Trimmu Barrage
Description | Value |
Year Of Commission |
1939 |
Maximum Design Capacity |
18265m3/sec (645000cfs) |
Normal pond Level |
150.0m (492ft) |
Crest level of themain weir |
145.5m (477.5ft) |
Crest level of left &right under-sluices |
143.9m (472ft) |
No. of Bays in the main weir |
37 |
No of bays in the left under-sluice |
8 |
No of bays in the right under-sluice |
6 |
Total width of waterway |
804.7m (2640ft) |
|
|
|