Project Brief Information

Small hydropower maintains its position as one of the most reliable and cost efficient renewable energy source.”

Noor Power is currently working on two hydro powers Project.

Balloki Sulemanki Hydro Power Project

The name of the project is Balloki Sulemanki Hydropower Project. It is on BS Link Canal II RD 193+339. The net capacity of this hydropower Project is 5MW The project site is located at Balloki-Sulemanki Link II Canal RD 193+339 in THESIL Chunian district Kasur. The site is 95 kilometer south of Lahore. The site is linked through wide networks of road to Okara, Pattoki, Kasur and Lahore. The site is easily accessible from Lahore via Raiwand Road.

The average climate of the site is hot dry in summer and cold in winters. July and August is known as monsoon season for the site. The summer average temperature ranges from 25 to 49 C and in winters it ranges from 2 to 20 C. The average humidity ranges from 35 to 75 % in August. The average rainfall of the site is 430mm.

Trimmu Hydro Power Project

Trimmu Hydropower Projectis of 19.2MW is on Trimmu barrage located about 3km downstream of the confluence of Jhelum and Chenab rivers near Jhang. The barrage is located at about 292km downstream of Marala Barrage on Chenab River near Jhang. It falls in the semi-arid zone with desert on its right and Rechna Doab on the left side. The site is linked through wide networks of road to Jhang at the famous town of Atharan Hazari where there is the confluence of rivers Chenab and Jhelum. At this point the Jhelum River flows into the Chenab River. The maximum design capacity of this barrage is 18265m3 /sec (645000 cfs).

Sitecredits: OCM-UMT